2009-01-13_19-57-54.JPG
Adapter Plate alignment, contd 22189 viewsThen we mounted the Bell Housing adapter plate.
2009-01-13_19-58-30.JPG
Adapter Plate alignment finished2696 viewsThen we slid on the Motor adapter plate.
This allowed us to drill the holes to bolt the 2 plates together, and put in a couple of locating pins between them so they can be taken apart and re-assembled without shifting.
2009-02-14_12-53-28.JPG
Position motors10464 viewsMotors were mounted to the transmission, then lifted in from below.
Transmission was then bolted to it's mounts, and the motors placed on blocks to keep everything in position
2009-02-15_17-09-34.JPG
Building Motor Mounting Framework9511 viewsWe decided it was easiest to juts build the motor mounting framework in place. Carefully cut pieces and clamp them in place, then tack weld it all together.
2009-02-17_13-13-58.JPG
Completed Motor Mount7774 viewsThis is the motor mounting framework, after all the welding was complete.

2009-02-17_15-54-18.JPG
Painted Motor Mount7969 viewsI then sandblasted it all ,and painted it.
2009-02-21_13-48-38.JPG
Motors Installed8864 viewsEverything is in and bolted down. The framework is mounted to the original rubber engine mounts that used to support the 460cui Gas Engine.
2009-03-24_16-13-34.JPG
Battery Box Bottom10105 viewsThis is the bottom of the battery box. It is 3/4" plywood with a 2x2 edge frame.
The colored boxes are pieces of plywood cut to the size of Golf Cart batteries.
2009-03-24_16-15-18.JPG
9578 viewsThis shows how there will be 6 batteries across at the back. (there are 8 across at the front)
     