
1st half coupler on motor2836 viewsMounted 1/2 the coupler on the first motor.
|
|

2nd half coupler mounted2474 viewsMounted the other half the coupler on the other motor.
|
|

Putting them together3412 viewsBoth motors together! Bolted to the motor-motor mount.
|
|

Bolting coupler together3724 viewsWe hadn't realized just how difficult it was going to be to tighten the bolts holding the coupler together. It was really awkward and hard. Took 2 people. (one turning the motor, the other holding the allen wrench.)
This was compouned when we discovered another alignment problem. Turns out that the end bells of the Impulse 9 motors aren't that accurately machine. We had a 10-20 thousandths variance between them that we had to shim.
|
|

Getting ready to put on the Flywheel adapter2678 viewsThe Flywheel adapter is also a heated press-fit. We made sure we had spacers to keep it from going on the shaft too far.
|
|

Flywheel adapter is on!3753 viewsCooling it down after pressing it on to the shaft. (more like setting it on, and tapping it gently down.)
|
|

Flywheel and cluth mounted3588 viewsBolted things together, bolted on the flywheel and clutch assemblies.
|
|

Motor and Transmission4200 viewsHere is the full drive assembly. Both Impulse 9 motors, transmission and transfer case.
We are going to lift it into the truck from the bottom.
|
|

Pulling the engine11205 viewsRemoving the 460cui gas engine. (Having a forklift really made this easier.)
All 762 pounds of it!
|
|

Motor-Motor mount ends3148 viewsWe started with some scrap plate steel from the local recycle place.
|
|

Motor-Motor mount body2279 viewsAnd a piece of old iron pipe from the same place.
|
|

Motor-Motor mount rough2403 viewsHere is the mount after some work in the lathe on both the raw pieces.
|
|
57 files on 5 page(s) |
1 |
 |
 |
|